翻訳と辞書
Words near each other
・ USS Mississinewa
・ USS Mississinewa (AO-144)
・ USS Mississinewa (AO-59)
・ USS Mississippi
・ USS Mississippi (1841)
・ USS Mississippi (BB-23)
・ USS Mississippi (BB-41)
・ USS Mississippi (CGN-40)
・ USS Mississippi (SSN-782)
・ USS Missoula
・ USS Missoula (APA-211)
・ USS Missouri
・ USS Missouri (1841)
・ USS Missouri (BB-11)
・ USS Missouri (BB-63)
USS Missouri (SSN-780)
・ USS Mist
・ USS Mist (1864)
・ USS Mist (SP-567)
・ USS Mistletoe
・ USS Mistletoe (1861)
・ USS Mistletoe (1872)
・ USS Mistletoe (WAGL-237)
・ USS Mitchell
・ USS Mitchell (DE-43)
・ USS Mitscher
・ USS Mitscher (DDG-57)
・ USS Mitscher (DL-2)
・ USS Mizar
・ USS Mizar (AF-12)


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

USS Missouri (SSN-780) : ウィキペディア英語版
USS Missouri (SSN-780)

USS ''Missouri'' (SSN-780) is the seventh attack submarine and the fourth ship in the United States Navy named in honor of the U.S. state of Missouri.〔 It was completed, and delivered, nine months early and under budget.
The contract to build ''Missouri'' was awarded to the Electric Boat Division of General Dynamics Corporation in Groton, Connecticut on 14 August 2003. Its keel was laid down on 27 September 2008.〔 The submarine was put in the water on 20 November 2009, and christened on 5 December 2009. ''Missouri''s sponsor is Becky Gates, wife of Secretary of Defense Robert Gates.〔
''Missouri'' was commissioned on 31 July 2010. Her first assignment is with Submarine Squadron 4 (SUBRON 4) based at US Naval Submarine Base New London, Groton, CT.〔McDermott, Jennifer, "USS Missouri Leading Way For New Wave of Submarines", ''New London Day'', 1 August 2010.〕
On 20 April 2012, command of the ''Missouri'' was handed over from Cmdr Timothy Rexrode to Cmdr Michael Luckett.〔McDermott, Jennifer, "New sub skipper to take USS Missouri to the next level", ''New London Day'', 20 April 2012.〕
The 7,800-ton submarine ''Missouri'' was built under a teaming arrangement between General Dynamics Electric Boat and Northrop Grumman Shipbuilding-Newport News. Sections of the submarine are built at both shipyards and then final assembly is completed at one or the other. In this instance, SSN-780 was assembled at the Groton/New London, Connecticut shipyard. Final assembly occurs alternately between the two. During the design and construction phases both shipyards collaborate to complete each submarine.
''Missouri'' completed her first 6-month deployment to the U.S. 6th Fleet on 20 December 2013.
== References ==


File:US Navy 091205-N-5549O-125 Rebecca Gates breaks a bottle of champagne on the sail of the Virginia-class attack submarine Pre-Commissioing Unit (PCU) Missouri (SSN 780).jpg|Rebecca Gates christens the ''Missouri'' at General Dynamics Electric Boat in Groton, Connecticut


抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「USS Missouri (SSN-780)」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.